Screen, underwrite, decide. Side by side.
Screen deals as fast as they arrive. Compare scenarios on the same screen, in six currencies. Decide with the same inputs your committee will see, pulled from the property record, not re-keyed.
Ten properties, same fields, same units, same numbers. No parallel spreadsheets.
Base, Stretch, Stress on one screen. IRR moves in real time as you flex inputs.
Underwrite in CHF, report in EUR. WorkLet keeps both numbers in sync.
Dataroom, offers, SPA. On the same record you screened from.
The Operations you live in.
Six modules; you operate primarily in these. Every other module pulls from the same record.
Property Data
Same schema as your CFO would write: area, tenancy, WALT, yield, EPC, capex. By default.
Read more →Investment Analysis
Pull from the record, not a model file. Edit a field; every scenario re-prices.
Read more →Scenario engine
Base, Stretch, Stress. IRR, EM, WALT, exit yield. Locked to the same record.
Read more →Six-currency ledger
EUR, USD, GBP, CHF, SEK, AED. Convert at execution; report at home.
Read more →Committee export
IC packs assembled from the record. Same numbers, every time, every committee.
Read more →What changes on day six.
Properties compared on one screen vs. one model file. Same schema, no copy-paste.
EUR, USD, GBP, CHF, SEK, AED. One ledger, conversion at execution.
Per property, by default. The schema your CFO would have written.
A Tuesday on WorkLet.
Sample operating day. Times CET; sequence reflects the typical rhythm of an investor operating WorkLet at full capacity.
Inbox emptied of teasers.
Five teasers structured into property records in twenty minutes. Same fields as every other asset in the screen.
First screen.
Ten properties side by side. Three pass yield + WALT + EPC threshold; seven killed before the morning coffee.
Scenario flexed.
Cap +25 bps, rent CAGR 30 bps lower. IRR drops from 9.4% to 7.1%. Decision stands; pass to DD.
Diligence opens on the lead asset.
Rent roll, EPC, leases, capex. Every file open logged to the analyst, with a 14-day expiry.
Mandate brief to GP.
Two assets short-listed. CRM packages a brief from the record; GP sees what you saw.
IC pack exported in CHF and EUR.
Same record, two currencies, one pack. No reconciliation step.
"We screen four times more deals per week, and we lose nothing in the handoff."
Operating WorkLet on the deal pipeline
Mainz, Rheinhessen
MoguntiaSelect, deal numbers on screen
Analyst workstation, property comparison sheet visible. Warm desk lamp, slight depth of field. Editorial.
Screen the next deal on WorkLet.
Five days from kick-off to first Operation. Pick the module that costs your team the most time today. Bring the rest when you're ready.